*Work on the Gold Line Bridge was completed on December 15, 2012.
November 25 – December 8, 2012
October 28 – November 10, 2012
September 30 – October 13, 2012
December 25, 2011 – January 07, 2012
December 11 – December 24, 2011
November 27 – December 10, 2011
November 13 – November 26, 2011
October 30 – November 12, 2011
September 18 – October 01, 2011
September 04 – September 17, 2011
August 21 – September 03, 2011
Thursday, July 9, 2015 thru Friday, July 10, 2015: Full closure of Mountain Ave at Duarte Rd for one night, from Thursday, July 9, 2015 at 8 PM to Friday, July 10, 2015 at 6 AM, to allow crews to stripe the roadway surface, Monrovia.
Saturday, August 15, 2015: Duarte Road closed from Hope Drive to Highland Avenue to vehicular traffic for station dedication ceremony, Duarte.
April 17, 2015 thru early June 2015: Nightly Train Testing from Pasadena to Irwindale.
May 16 – 17, 2015: Highland Ave weekend street closure at Duarte Rd., Duarte.
February 2015 thru Summer 2015: Train Testing & Extended Work Hours.
February 2015 thru Summer 2015: Letter to Our Neighbors Regarding Train Testing and Extended Work Hours.
February 23 – 24, 2015; March 6 – 7, 2015: Water line tie-in work at the intersection of east frontage street Irwindale Road and Avenida Padilla. Water will be shut down for a short period of time, Azusa.
November 19, 2014: Palm Dr at the railroad bridges will be fully closed to thru-traffic, from 8 AM to 6 PM, to allow crews to complete final paving work, Azusa.
October 7 – 10, 2014: Palm Dr will be closed daily, from 7 AM to 6 PM, at the railroad bridge to allow crews to install decorative concrete panels on the north side of the bridge, Azusa.
September 26 – 29, 2014: Full weekend intersection closure of Mountain Ave and Duarte Rd. Mountain Ave, south of Duarte Rd, to re-open on September 29, 2014, Monrovia & Duarte.
Beginning September 21, 2014 for three weeks: Huntington Dr will be closed to thru-traffic at Second Ave in either eastbound or westbound direction (not concurrently) and thru-traffic on Second Ave at the intersection will be restricted to allow crews to paint the bridge girders. No work will be performed on Friday or Saturday nights, Arcadia.
August 24, 2014 – September 26, 2014: Mountain Ave will be fully closed to thru-traffic from the center of Duarte Rd south through the intersection. Duarte Rd will be open to thru-traffic in both eastbound and westbound directions, Monrovia & Duarte.
September 16 – 17, 2014: The intersection of Huntington Dr and Second Ave will be fully closed to thru-traffic to pour concrete atop the newly constructed light rail bridge structure, Arcadia.
May 12, 2014 – August 24, 2014: Mountain Ave will be fully closed north of Duarte Rd for five months, in the first of two phases, for construction of grade crossing improvements, Monrovia & Duarte. Update: June 10, 2014 – late August 2014: Extended work hours to expedite construction.
August 22 – 24, 2014: The entire intersection of Mountain Ave and Duarte Rd will be closed to thru-traffic to reconfigure the traffic lanes and prepare for the next phased closure, Monrovia & Duarte.
August 21 – 22, 2014: Myrtle Ave and Pomona Ave will each be fully closed on separate nights, from 8 PM to 6 AM, to thru-traffic to allow crews to install underground conduits, Monrovia.
August 11 – 18, 2014: Partial lane closures on South Primose Ave, south of West Pomona Ave, to allow for water line tie-ins, Monrovia.
March 31, 2014 – August 15, 2014: Virginia Ave will be fully closed to thru-traffic in both directions just south of Foothill Blvd and north of Sixth St, Azusa.
August 8 – 12, 2014: The intersection of Huntington Dr and Second Ave will be fully closed to thru-traffic to install the bridge girders, Arcadia.
August 4 – 8, 2014: Daytime closures of the access road from eastbound Colorado Blvd onto southbound Baldwin Ave, Arcadia.
July 20, 2014 – August 1, 2014: Nighttime closures of Second Ave at Huntington Dr, Arcadia.
July 26, 2014: Full closure of Duarte Rd at Hope Dr to allow for underground conduit installation, Duarte.
July 24 & 25, 2014: Myrtle Ave and Pomona Ave will each be fully closed on separate nights, from 8 PM to 6 AM, to thru-traffic to allow crews to install underground conduits, Monrovia.
June 29, 2014 – July 24, 2014: Southbound Baldwin Ave, from the I-210 Freeway overpass to just south of Colorado Blvd, will be fully closed to thru-traffic in a series of full, nighttime and daytime closures to allow crews to install underground duct banks and electrical vaults, Arcadia.
April 21, 2014 – August 2014: Magnolia Ave will be fully closed for four months, between Pomona Ave and Genoa St, for construction of grade crossing improvements. A free shuttle service will be provided to assist pedestrians around closure from 7 AM to 7 PM daily, Monrovia.
June 9, 2014 – July 22, 2014: Eastbound Foothill Blvd will be fully closed to thru-traffic between Vernon Ave and Orange Ave during nighttime/early morning hours on June 9 – 10, 2014 and July 8 – 22, 2014, Azusa.
May 1, 2014 – June 30, 2014: Crews will be working extended work hours from 6 AM to 8 PM for Gold Line Bridge track work, Arcadia.
June 24, 2014 – mid-July 2014: Genoa St at Magnolia Ave will be closed to thru-traffic to allow crews to upgrade the sidewalks and install a new concrete curbed median, Monrovia.
Dec. 2012 – June 2014: Construction Activities within Railroad Corridor, Monrovia.
July 19, 2014: Full closure of Central Ave and Business Center Dr at Highland Ave to allow for underground conduit installation, Duarte.
June 2, 2014 – July 7, 2014: Westbound Foothill Blvd will be fully closed to thru-traffic between Vernon Ave and Orange Ave during nighttime/early morning hours on June 2 – 6, 2014 and June 23, 2014 – July 7, 2014, Azusa.
July 8, 2014: 9th St at Pasadena Ave will be fully closed to thru-traffic to allow crews to install new traffic signals, Azusa.
June 20 – 21, 2014: Foothill Blvd will be fully closed to thru-traffic between Vernon Ave and Orange Ave, Azusa.
June 9 – 20, 2014: Lane closures on Santa Clara St between Santa Anita Ave and First Ave, Arcadia.
May 20, 2014 – June 10, 2014: Extended work hours at Mountain Ave to install storm drain, Duarte.
May 5 – 10, 2014: Nighttime lane closures on southbound Rosemead Blvd (between Foothill Blvd and Colorado Blvd), Pasadena.
End of July 2013 – mid-May 2014: Long-Term Lane Closures on San Gabriel Ave, Azusa.
April 28, 2014 – May 13, 2014: Street improvement work on Flower St, between La Porte St and St Joseph St, just north of the railroad corridor, Arcadia.
March 17, 2014 – May 4, 2014: Nighttime lane closures on northbound Rosemead Blvd (between Foothill Blvd and Colorado Blvd), Pasadena.
April 25 – 27, 2014: Weekend work to encase underground waterline, Azusa.
April 25 – 28, 2014: San Gabriel Ave will be fully closed to thru-traffic in both directions between Ninth St and Foothill Blvd, Azusa.
April 28, 2014 – May 1, 2014: Santa Anita Ave (between Colorado Blvd and Santa Clara St) will be fully closed to thru-traffic for two nights in each direction, Arcadia.
May 5, 2014 – June 2014: Westbound Foothill Blvd will be closed to thru-traffic daily between Vernon Ave and Orange Ave, Azusa.
March 24, 2014 – May 4, 2014: Eastbound Foothill Blvd will be closed to thru-traffic daily between Vernon Ave and Orange Ave, Azusa.
Beginning July 2013: Long-term periodic lane closures on Mountain Ave and Duarte Rd, Monrovia & Duarte.
April 15 – 17, 2014: Full night closure of Myrtle Ave & Duarte Rd intersection, followed by full re-opening of streets in all directions, Monrovia.
Jan. 20, 2014 – May 2014: Myrtle Ave will be fully closed for four months, just north of Duarte Rd, for construction of grade crossing improvements, Monrovia.
March 7 – 10, 21 – 24, 28 – 31, 2014: Foothill Blvd will be closed to thru-traffic in both directions between Vernon Ave and Orange Ave, Azusa.
March 31, 2014 – July 2014: Letter to Our Neighbors Regarding Upcoming Closures of Virginia Ave at Railroad Crossing, Azusa.
March 7, 2014 – June 2014: Letter to Our Neighbors Regarding Upcoming Closures of Foothill Blvd at Railroad Bridges, Azusa.
Late Oct. 2013 – Early March 2014: Full nighttime southbound closure of Michillinda Ave (between Foothill Blvd. and Colorado Blvd) for installation of underground power and communications duct banks, Pasadena.
Sept. 2013 – March 2014: Long-term closure of intersection and sidewalk at 1st Ave & Santa Clara St, Arcadia. (Updated notice)
March 6, 2014: Temporary lane closures on Santa Anita Ave for street paving, Arcadia.
Feb. 14 – 15, 2014: Nighttime closure of eastbound Foothill Blvd, Azusa.
Feb. 7 – 9, 2014: Underground waterline installation at railroad corridor, Azusa.
Jan. 18 – 19, 2014: Nightly closures of Myrtle Ave/Duarte Rd intersection, Monrovia.
Dec. 2013 – Jan. 2014: Wall construction along Indiana St. (between First Av & Second Av east of where Wheeler Ave dead ends), Arcadia.
Jan. 16, 2014: Nighttime closure of eastbound Foothill Blvd, Azusa.
Beginning August 12, 2013: Retaining Wall Construction within Railroad Corridor between 1-210 Gold Line Bridge and Colorado Blvd, Arcadia.
Jan. 6-9, 2014: Nightly lane closures on Santa Anita Ave for installation of bridge deck beams, Arcadia.
Nov. 16 2013 – end of Feb. 2014: California Ave closed just south of Duarte Rd for second phase of construction of grade crossing improvements, Monrovia.
Jan. 13, 2014: One-day intersection closure of California Ave & Duarte Rd. Streets to re-open in all directions following closure, Monrovia.
Oct. 17, 2013: California Ave crossing FAQs
Jan. 10-12, 2014: Underground utilities relocation on San Gabriel Ave at the railroad corridor, Azusa
July 2013 – Nov. 2013: Long-term lane closures on San Gabriel Ave, Azusa
Mid Oct. – Dec. 2013: Temporary lane closures on intersection of N. Irwindale Ave and Adelante St for construction of Intersection improvements/new traffic signal, Irwindale.
Sept. 26 – early Dec. 2013: Full closure of Mayflower Ave at railroad crossing (between Duarte Rd and Evergreen Ave) for construction of grade crossing improvements. Monrovia.
Sept. 9, 2013 – Feb. 2014: Long-term closure of intersection at 1st Ave & Santa Clara St. Arcadia.
Nov. 20-22, 2013: Full closure of Palm Dr (at rail bridges) for installation of bridge deck beams for two light rail bridges over Palm Dr, Azusa.
Nov. 16 2013: One-day closure of California Ave/Duarte Rd intersection for construction of grade crossing improvements, Monrovia.
Nov. 8-9, 2013: Full nighttime closure of Foothill Blvd for traffic lane shift beginning at 7PM, Friday, Nov. 8, 2013 until 7AM Saturday Nov. 9, 2013, Azusa.
Sept. 18, 2013: Permanent Road Closure: Front St (between Santa Clara St and St. Joseph St) to be closed permanently as of Sept. 18. Arcadia.
Nov. 7, 2013: One-day closure of California Ave/Duarte Rd intersection for construction of grade crossing improvements on Thursday, Nov. 7, 2013 from 7AM to 7PM. Monrovia.
Oct. 30-31, 2013: Full closure of Santa Anita Ave for reconfiguration of traffic lanes from Wednesday, October 30, 2013 at 10PM until 6AM Thursday morning, Arcadia
Oct. 14-21, 2013: Hydrant relocation on Cornell Dr. Cornell Dr. to be narrowed to one lane for both eastbound and westbound traffic during activity, Arcadia
Starting July 2013: Long-term closures on Mountain Ave and Duarte, Monrovia/Duarte 2
Beginning July 2013: Long-term closures on Mountain Ave and Duarte Rd. Monrovia/Duarte 1
Jan. 14 – Sept. 27, 2013: Long-Term Lane Closures on Foothill Boulevard in Azusa
Mar. 9 – Oct. 2013: California Ave closed at railroad crossing (just north of Duarte Rd.), Monrovia
Sept. 24, 2013: Installation of Bridge Deck Beams at Santa Anita Wash Bridge, Monrovia
Feb. 25, 2013 – late Aug. 2013: Railroad Bridge Construction at Santa Anita Wash, Monrovia
Tues. Sept. 10, 2013: Temporary water service interruption – Duarte Rd and California Ave, Monrovia
Week of Sept. 9, 2013: Nighttime track relocation work within railroad corridor between Virginia Ave and Pasadena Ave in Azusa.
July 30 – mid-August 2013: Utility installation on Flower St, Arcadia
Aug. 6, 2013 – late Aug. 2013: Night (3PM – 12AM) and weekend work along railroad corridor between Dalton Ave in Azusa and Barranca Ave in Glendora.
Aug. 3, 2013 – late Aug. 2013: Lane closures on Buena Vista St and Duarte Rd for intersection improvements. One lane will remain open in both directions. No left turn will be allowed from northbound Buena Vista St onto westbound Duarte Rd, Duarte
Aug. 22, 2013 & Aug. 24, 2013: Two full closures of the intersection with Duarte Rd this week: (1) Thursday, August 22 from 7PM to 5AM the next morning; (2) all day Saturday, August 24, 2013 from 7AM to 7PM, Duarte.
May 20 – End of Oct. 2013: Long term lane closures for Santa Anita Bridge construction (north and south bound lanes) started May 20, 2013 and will continue for approx 7 months, Arcadia – Mandarin Version.
Aug. 9, 2013 – Aug. 12, 2013 & Aug. 16, 2013 – Aug. 19, 2013: Weekend / Overnight work on San Gabriel Ave at Railroad Corridor, Azusa.
End of June 2013 – August 2013: Full closure of Pasadena Ave. at railroad crossing, Azusa
Dec. 3, 2012 – June 30, 2013: Construction Activities within Railroad Corridor in Irwindale, CA
Beginning May 1, 2013: Full closure of Virginia Ave for utility relocation, Azusa
Aug. 1, 2013 – Aug. 5, 2013: Full closure of Palm Dr from 7AM Thursday, August 1, 2013 to 7AM Monday, August 5, 2013 for reight bridge relocation, Azusa
Dec. 2012 – Jul. 2014: Construction Activities within Railroad Corridor in Duarte
Apr. 29 – Through- Late July, 2013: Azusa Ave closed at railroad crossing, Azusa
July 19, 2013 – July 22, 2013: 24-Hours per day work activity at railroad corridor from Citrus Ave to Barranca Ave. Azusa
Dec. 3, 2012 – June 30, 2013: Construction Activities within Railroad Corridor in Irwindale
Oct. 15, 2012 – Jun. 30, 2013: Construction Activities within Railroad Corridor in Azusa
Oct. 15, 2012 – Jun. 30, 2013: Construction Activities within Railroad Corridor in Glendora
July 12 through July 14, 2013: Weekend / night work near Virginia Avenue, Azusa
Feb. 25 – Jun 30, 2013: Railroad Bridge Construction at Santa Anita Wash, Monrovia
Beginning May 2013: Ongoing utility relocation work at Pasadena Ave. requires lane closures, weekend, and nighttime work, Azusa
Feb. 18 through July, 2013: Full closure of Dalton Ave, Azusa
June 17-21, 2013: Utility installation on California Ave – 24-hours per day work activity, Monrovia
Nov. 26, 2012 – May 31, 2013: Station Construction Activities within Railroad Corridor in Duarte, CA
May 28, 2013 through June 16, 2013: Occassional lane closures on Buena Vista St and Duarte Rd, Duarte
Beginning April 23, 2013: Utility relocation work on Mountain Ave., Monrovia/Duarte
Feb. 18 through Late May, 2013: Dalton Ave. Full Closure, Azusa
May 21 & May 22, 2013: Intersection Closure at First Ave. and Santa Clara, Arcadia
May 22, 2013: Temporary Water Service Interruption, Dalton Ave., Azusa
Jan. 7 – 3rd Week of May 2013: Extension of Colorado Blvd. Closure, Arcadia
May 3-5, 2013: Weekend/Nightwork on Virginia Ave. for Utility Installation, Azusa
Jan. 7 – May 3, 2013: Temporary Closure on Palm Dr., Azusa
Apr. 22 – Apr. 26, 2013: Street Closure Santa Fe Ave. and Azusa Ave., Azusa
April 24, 2013: Temporary Water Service Interruption on Foothill Blvd. Azusa
April 30, 2013: Lane Closures on Huntington Dr., Arcadia
Oct. 29, 2012 – Mar. 31, 2013: Construction in Railroad Corridor, Azusa
Feb. – Mar., 2013: Wall Construction in Railroad Corridor, Azusa
Mar. 22-24, 2013: Freight Track Realignment, Azusa
Mar. 9, 2013: One-Day Closure California/Duarte Intersection, Duarte
Feb. 4 – Mar. 11, 2013: Highland Ave. at Duarte Rd. Four Week Closure, Duarte
Feb. 11-15, 2013: Lane Closures for Underground Utility Work at Evergreen Ave and Shamrock Ave, Monrovia
Feb. 12, 2013: Temporary Water Service Interruption, Soldano Ave, Azusa
Feb. 11-13, 2013: Lane Closure for Tree Removal Work on Santa Anita Avenue, Arcadia
Feb. 7, 2013: Lane Closure on Northbound Rosemead Blvd., Pasadena
Feb 6-8, 2013: Lane Closure on Northbound California Ave, Monrovia
Nov. 5 – Dec. 14, 2012: Lane Closures along Myrtle Ave, Monrovia
Dec. 10, 2012 – Jan. 25, 2013: Vegetation Removal in Railroad Corridor, Monrovia
Dec. 2012 – Jan. 2013: 5th Ave Pedestrian Tunnel, Monrovia
Jan. 9, 2013: Water Line Relocation, Azusa
Dec. 5-31, 2012: Vegetation Removal in Railroad Corridor, Arcadia
Nov. 5 – 16, 2012: Vegetation Removal in Railroad Corridor, Arcadia
Nov. 30 – Dec. 17, 2012: Utility Installation within Railroad Corridor, Azusa
Dec. 8, 2012: Street Closure: N. Virginia Ave at Railroad Crossing, Azusa
Nov. 16 – 18, 2012: Signal and Crossing System Testing, Azusa
Nov. 27 – Dec. 11, 2012: Wall Construction within Railroad Corridor, Azusa
Oct. 22 – Nov. 9, 2012: Removing Existing Railroad Tracks, Azusa
Nov. 2-3, 2012: Street Closures near Railroad Crossing, Azusa
Oct. 29 – Dec. 10, 2012: Installation of Underground Utility along Evergreen Ave, Monrovia
Nov. 26 – Dec. 3. 2012: Vegetation Removal in Railroad Corridor, Duarte
Sept. 26 – Oct. 26, 2012: Demolition Activity within Maintenance and Operations Facility, Monrovia
Sept. 11 – Oct. 26, 2012: Removing Existing Railroad Tracks, Azusa
Aug. 1 – Nov. 1, 2012: Installation of Underground Utilities, Azusa
Aug. 1 – Nov. 1, 2012: Installation of Underground Utilities, Irwindale
Aug. 1 – Nov. 1, 2012: Installation of Underground Utilities, Glendora
Sept. 24 – Oct. 5, 2012: Closure of Magnolia Ave. between Genoa St. and Pomona Ave., Monrovia
Sept. 24, 2012: Closure of N. Duarte Rd, north of Railroad Corridor, Monrovia
Sept. 4-10, 2012: Vegetation Removal within Railroad Corridor, Irwindale
Aug. 23 – Sept. 5, 2012: Vegetation Removal within Railroad Corridor, Azusa
Aug. 23 – Sept. 28, 2012: Removing Existing Railroad Tracks from
Mountain Ave. to Highland Ave., Duarte
Aug. 20 – Sept. 4, 2012: Reinforcement of Underground Utility Lines, Azusa
Aug. 7 – Sept. 4, 2012: Underground Utility Placement on Shamrock Ave., Monrovia
July 31 – Aug. 31, 2012: Removing Existing Railroad Tracks from Myrtle Ave. to Mountain Ave., Monrovia
July 30 – Aug. 3, 2012: Vegetation Removal within Railroad Corridor, Azusa
July 30 – Aug. 3, 2012: Vegetation Removal within Railroad Corridor, Glendora
July 20, 2012: Underground Utility Examination on Duarte Rd., Monrovia
July 13 – August 10, 2012: Removing Existing Railroad Tracks from Magnolia Ave. to Myrtle Ave., Monrovia
July 1-31, 2012: Removing Existing Railroad Tracks from S. 5th Ave. to
S. Magnolia Ave., Monrovia
July 9-11, 2012: Underground Soil Investigation at Existing Railroad Tracks, Irwindale
July 9-11, 2012: Underground Soil Investigation at Existing Railroad Tracks, Azusa
July 5, 2012: Underground Utility Examination on Magnolia Ave., Monrovia
July 5, 2012: Underground Utility Examination on Shamrock Ave., Monrovia
June 19 – July 13, 2012: Removing Existing Railroad Tracks from S. 5th Ave. to
S. Magnolia Ave., Monrovia
June 19-22, 2012: Lane Closures for Underground Utility Examination, Pasadena
June 19-22, 2012: Lane Closures for Underground Utility Examination, Arcadia
June 11-15, 2011: Full Closure of Colorado Boulevard for Bridge Removal,
June 7, 2012: Underground Soil Investigation at Existing Railroad Tracks, Glendora
June 6-7, 2012: Underground Soil Investigation at Existing Railroad Tracks, Azusa1,
June 6-7, 2012: Underground Utility Work near the Existing Railroad Tracks, Azusa2
June 5, 2012: Underground Soil Investigation at Existing Railroad Tracks, Monrovia
May 29, 2012: Lane closure for Asphalt Paving on Santa Anita Avenue at Railroad Track Crossing, Arcadia
May 29, 2012: Underground Utility Examination near the Existing Railroad Tracks, Monrovia
May 30, 2012: Underground Utility Examination near the Existing Railroad Tracks and Railroad Street Crossings, Monrovia
May 31, 2012: Underground Utility Examination near the Existing Railroad Tracks and Railroad Street Crossings, Monrovia
June 1, 2012: Underground Utility Examination near the Existing Railroad Tracks and Railroad Street Crossings, Monrovia
May 24-25, 2012: Lane Closures for Underground Utility Examination, Pasadena
May 23-25, 2012: Underground Utility Examination near the Existing Railroad Tracks and Railroad Street Crossings, Monrovia
May 23, 2012: Underground Utility Examination near the Existing Railroad Tracks and Railroad Street Crossings, Duarte
May 21 – June 15, 2012: Four-Week Closure of Colorado Boulevard for Bridge Removal, Arcadia
May 21, 2012: Underground Utility Examination near the Existing Railroad Tracks and Railroad Street Crossings, Arcadia
May 14 – May 23, 2012: Underground Utility Work at Duarte Rd. and Highland Ave., Duarte
May 7-9, 2012: Excavation to Verify Bridge Foundations at 2nd Ave. and Huntington Dr., Arcadia,
May 7-8, 2012: Excavation to Verify Bridge Foundations at Foothill Blvd. between N. Vernon Ave. and N. Angeleno Ave., Azusa
April 30 – May 25, 2012: Removing Existing Railroad Tracks from Newcastle Park to South 5th Ave., Arcadia
April 30 – May 25, 2012: Removing Existing Railroad Tracks from South 5th Ave. to South Magnolia Ave., Monrovia
Mar. 22 – Apr. 5, 2012: Underground Utility Investigation at Railroad Street Crossing, Monrovia
Mar. 22 – Apr. 5, 2012: Underground Utility and Soil Investigation along the Railroad Including Railroad Street Crossings, Monrovia
Mar. 22 – Apr. 5, 2012: Underground Utility and Soil Investigation along the Railroad Including Railroad Street Crossings, Duarte
Mar. 20 – Mar. 23, 2012: Underground Utility Investigation at Railroad Street Crossing, Azusa
Feb. 20 – 24, 2012: Soil Investigation Along the Railroad, Arcadia and Soil Investigation Along the Railroad, Monrovia
Jan. 23 – Feb. 17, 2012: Underground Utility and Soil Investigation along the Railroad Including Railroad Street Crossings, Arcadia,
Jan. 23 – Feb. 17, 2012: Underground Utility and Soil Investigation along the Railroad Including Railroad Street Crossings, Monrovia,
Jan. 23 – Feb. 17, 2012: Underground Utility and Soil Investigation along the Railroad Including Railroad Street Crossings, Duarte,
Jan. 23 – Feb. 17, 2012: Underground Utility and Soil Investigation along the Railroad Including Railroad Street Crossings, Azusa
January 9, 2012: Lane Closures for Soil Investigation, Azusa