METRO GOLD LINE FOOTHILL EXTENSION (FOOTHILL GOLD LINE) FROM AZUSA TO MONTCLAIR (GLENDORA TO MONTCLAIR) PROJECT

The Construction Authority, as the lead agency under the California Environmental Quality Act, certified a Final Environmental Impact Report in 2013 (2013 FEIR) for the Azusa/Glendora to Montclair Project (Project). Following the certification of the 2013 FEIR, the Construction Authority identified a number of refinements to the Project. The Construction Authority has since approved four addenda to the 2013 FEIR, and a Supplemental EIR (SEIR) in 2019.

In June 2020, the Construction Authority initiated the preparation of a second Supplemental Environmental Impact Report in response to potential Project Modifications to the station-area parking facilities. The Draft SEIR was published in September 2020 for a 45-day public comment period and the Final SEIR was published on January 6, 2021 (including the response to comments on the Draft SEIR). The Construction Authority board of directors will consider certifying the Final SEIR and approving the project modifications at their January 13, 2021 meeting.

Below, in order of most current to oldest, are links to all environmental review documents for the Project. Starting on top is the 2021 Final Supplemental Environmental Impact Report; with links below to the 2013 FEIR, the four subsequent addenda and the 2019 SEIR:

2021 Final Supplemental Environmental Impact Report (NOT YET CERTIFIED): Evaluating Station Area Parking Modifications at Glendora, San Dimas, La Verne, Pomona and Claremont (January 2021)

The Final SEIR will be considered for certification, and the project modifications considered for approval, at the January 13, 2021 Construction Authority board of directors meeting. Here is a link to the Final SEIR document:

Final SEIR (table of contents on page 3)


Draft SEIR (September 2020):

Notice of Availability of the Draft SEIR

FULL REPORT:  DRAFT 2020 SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT (SEIR)

(NOTE: The Table of Contents is located on Page 5)

Appendices to the Draft SEIR:

 

Previously Approved Environmental Reviews

2019 Final SEIR (Certified in July 2019): Phased Construction and Operation of the Project – APU/Citrus College Station to Pomona Station and Minor Alignment Adjustments in Glendora (June 2019)

Notice of Availability

Final SEIR (table of contents on page 5)

Appendices

Addendum No. 4 (September 2017)

Addendum No. 3 (March 2016)

Addendum No. 2 (November 2014)

Addendum No. 1 (May 2014)

Final Environmental Impact Report (2013)

The Final EIR was published on February 14, 2013. The Final EIR was certified and the project’s Locally Preferred Alternative selected by the Construction Authority board of directors on March 6, 2013.

Volume 1: Final EIR

Volume 2: Responses to Comments

Volume 3: Appendices

To order a copy of any of these documents, complete a public information request here.

To access previously approved Environmental Impact Reports please click here.